工業產品采購合同樣本(doc 8頁)
工業產品采購合同樣本(doc 8頁)內容簡介
工業產品采購合同樣本內容提要:
交貨周期:
1.Purchase contract signed and down payment received
采購合同簽署,以及付款條件實現和遵守
2.Correct part’s drawing and customer specification
合格的產品圖紙和買方技術要求
3.Correct and enough sample parts
合格且足夠的樣品樣件
4.Buyer must provide written confirmation for design approval, pre-acceptance, finial acceptance; When process delay is caused by the buyer, the delay will not be calculated into delivery time.
買方需對完成的設計評審、預驗收、終驗收等關鍵項目進度向買方提供及時的書麵回複確認; 因買方單方麵原因造成項目推進延誤的時間,不計入交貨周期。
5.When the buyer changes specification, the delay will not be calculated into delivery time.
買方過程中提出技術變更要求的時間不計入交貨期
6.If the buyer delays the shipment or the acceptance and he is responsible for this, he is charged for the additional costs that are occurred because of the delay.
如果買方推遲發貨或延遲接收貨物且屬於買方責任的,買方應負擔為推遲發貨而發生的額外費用。
7.If the delay if caused by higher force, industrial action or actions that are outside of the influence of the supplier, the delivery time is to be extended adequately. The supplier has to inform the buyer as soon as possible about those circumstances.
如果發貨因為不可抗力、罷工等供貨方無法控製的原因推遲,交貨時間應相應延期。供貨方應及時將上述情況通知買方。
..............................
交貨周期:
1.Purchase contract signed and down payment received
采購合同簽署,以及付款條件實現和遵守
2.Correct part’s drawing and customer specification
合格的產品圖紙和買方技術要求
3.Correct and enough sample parts
合格且足夠的樣品樣件
4.Buyer must provide written confirmation for design approval, pre-acceptance, finial acceptance; When process delay is caused by the buyer, the delay will not be calculated into delivery time.
買方需對完成的設計評審、預驗收、終驗收等關鍵項目進度向買方提供及時的書麵回複確認; 因買方單方麵原因造成項目推進延誤的時間,不計入交貨周期。
5.When the buyer changes specification, the delay will not be calculated into delivery time.
買方過程中提出技術變更要求的時間不計入交貨期
6.If the buyer delays the shipment or the acceptance and he is responsible for this, he is charged for the additional costs that are occurred because of the delay.
如果買方推遲發貨或延遲接收貨物且屬於買方責任的,買方應負擔為推遲發貨而發生的額外費用。
7.If the delay if caused by higher force, industrial action or actions that are outside of the influence of the supplier, the delivery time is to be extended adequately. The supplier has to inform the buyer as soon as possible about those circumstances.
如果發貨因為不可抗力、罷工等供貨方無法控製的原因推遲,交貨時間應相應延期。供貨方應及時將上述情況通知買方。
..............................