電力危機谘詢報告(英文版)(ppt 14頁)
電力危機谘詢報告(英文版)(ppt 14頁)內容簡介
電力危機谘詢報告內容摘要:
Action needs to be taken today to prevent another energy crisis
CEC estimates indicate that operating reserves could drop below typical “emergency” levels if we have a hot summer
Unfortunately, the CEC’s demand estimates appear low relative to trend and a “high demand case” (i.e., hot summer) may be as likely as a 1-in-5 occurrence
Taking into account realistic levels of future demand, operating reserves could be extremely tight by 2006 – as low as 5.8% (in a 1-in-5 year demand case)
5 steps that will ensure a long-term sustainable market for powerNew generation needs to be built today, given the long lead time, and a mechanism for market-based contracts with utilities needs to be introduced
California should introduce mandatory time-of-use metering for all classes of customers
New transmission needs to be built and facilitated through a expedited and coordinated approval process by the PUC, ISO, CEC, and FERC
A formal capacity market combined with a mandatory planning reserve target (e.g., 15-20%) needs to be in place by 2006
The State should re-introduce elements of retail choice, providing an opportunity for large consumers to shop for power
..............................
Action needs to be taken today to prevent another energy crisis
CEC estimates indicate that operating reserves could drop below typical “emergency” levels if we have a hot summer
Unfortunately, the CEC’s demand estimates appear low relative to trend and a “high demand case” (i.e., hot summer) may be as likely as a 1-in-5 occurrence
Taking into account realistic levels of future demand, operating reserves could be extremely tight by 2006 – as low as 5.8% (in a 1-in-5 year demand case)
5 steps that will ensure a long-term sustainable market for powerNew generation needs to be built today, given the long lead time, and a mechanism for market-based contracts with utilities needs to be introduced
California should introduce mandatory time-of-use metering for all classes of customers
New transmission needs to be built and facilitated through a expedited and coordinated approval process by the PUC, ISO, CEC, and FERC
A formal capacity market combined with a mandatory planning reserve target (e.g., 15-20%) needs to be in place by 2006
The State should re-introduce elements of retail choice, providing an opportunity for large consumers to shop for power
..............................
用戶登陸
企業谘詢熱門資料
企業谘詢相關下載