供應商表現發展過程英文(ppt 18頁)
Production Part Approval Process (PPAP)
Production parts are manufactured at the production site using production tooling, gaging, equipment, operators, etc
Parts from production run are analyzed
Test results and records from APQP are submitted with Part Submission Warrant
For the supplier to demonstrate
all design records and specification requirements are properly understood
the process has the capability to produce product that meets requirements
AIAG PPAP manual defines when PPAP submission is required
New part
Correction to discrepancy in previous submission
Design or process change
Change in source of subcontracted materials or services
transfer or rearrangement of tooling & equipment
Default level for raw material is 4
PPAP package forms, checklists, charts, capability analysis, measurement analysis included in PPAPall in an Electronic Format
..............................